-40%

Jersey Central Lines Railway Reproduction Railroad Herald Sign 14" Round Steel

$ 13.7

Availability: 100 in stock
  • All returns accepted: ReturnsNotAccepted
  • Condition: New

    Description

    Central Railroad of New Jersey or Jersey Central Lines Railway Reproduction Railroad Herald Sign 14" Round 24 ga. Steel
    Railroad Painted Sign. This Sign Has Eyelets For Mounting. Made In The USA.
    Ready for that Den Train room Garage Business decoration. t
    RG8843
    From Wikipedia:
    he Central Railroad of New Jersey, also known as the Jersey Central or Jersey Central Lines (reporting mark CNJ), was a Class I railroad with origins in the 1830s. It filed for bankruptcy three times; in 1939, 1947 and on March 22, 1967, when the CNJ filed for bankruptcy for the final time. It foreshadowed the rest of New Jersey's railroads, but not by much. It then pulled out of Pennsylvania completely in 1972. While most of the passenger services, structures and equipment were picked up by the State of New Jersey, later NJ Transit, it was absorbed into Conrail in April 1976 along with several other prominent bankrupt railroads of the northeastern United States. Only two of the railroad's steam locomotives were preserved: CNJ No. 592 & CNJ No. 113; the latter is the only one that is still operational.
    The CNJ's main line had a major presence in New Jersey. Most of the main line is now used by the Raritan Valley Line passenger service and trackage from the CNJ main line in Phillipsburg, New Jersey became part of the Lehigh Line under Conrail; the Lehigh Line is officially the former main line of the Lehigh Valley Railroad.
    Contents
    1
    History
    1.1
    Origins
    1.2
    Expansion
    2
    Main initial corridors
    3
    Portions still operated
    4
    Gallery
    5
    Predecessor railroads
    6
    Named passenger trains
    7
    Heritage Units
    8
    See also
    9
    References
    10
    Further reading
    History
    Origins
    Map of CNJ and other terminals in New York region ca. 1900
    The Elizabethtown and Somerville Railroad was chartered on February 9, 1831, to build from Elizabeth on the Newark Bay (with a steamboat transfer to New York City) west to Somerville. The line to Plainfield was completed in March 1839, connecting to the New Jersey Rail Road in Elizabeth. Extensions took it west to Dunellen in 1840, just east of Bound Brook in 1841 and to Somerville in 1842.
    The Somerville and Easton Railroad was chartered on February 26, 1847, to continue the line west to Easton, Pennsylvania. The first extension, to Whitehouse, opened in 1848 and was leased to the Elizabethtown and Somerville Railroad. On February 11, 1849, the Elizabethtown and Somerville Railroad bought the Somerville and Easton Railroad, and on February 26 the two companies were consolidated as the Central Railroad of New Jersey.
    The rest of the line to Phillipsburg opened in 1852, and on September 8, 1855, the upper level of the Lehigh Valley Railroad's Easton Bridge over the Delaware River, extended the CNJ to Easton. At that time, Lehigh Valley coal trains began running over the CNJ to Elizabeth. A similar operation with the Delaware, Lackawanna and Western Railroad, joining at Hampton, began May 27, 1856. This required the addition of a third rail as the DL&W was 6 ft (1,829 mm) broad gauge.
    On December 1, 1859, the CNJ arranged to run over the New Jersey Rail Road to the latter's terminal in Jersey City. That operation began December 19, and included a third rail for DL&W trains.
    The South Branch Railroad, controlled by the CNJ, opened July 1, 1864, as a branch from Somerville to Flemington. The CNJ's extension to its new terminal in Jersey City, including the first CRRNJ Newark Bay Bridge, opened on July 29, 1864, with a ferry transfer to Cortlandt Street in New York City, ending operations over the NJRR. On July 23, 1869, the Newark and New York Railroad opened, providing a straight route from downtown Newark to the CNJ's Jersey City terminal.[1] The Newark Branch, running north from Elizabethport to the N&NY in Newark, opened June 7, 1872.
    Expansion
    A train on the CNJ's mainline near Cranford, New Jersey in 1969
    A CNJ commuter train at Bay Head station in 1971
    On October 6, 1873, the CNJ leased the New York and Long Branch Railroad, which was in the process of building from Perth Amboy southeast to Long Branch. At the same time the Perth Amboy and Elizabethport Railroad was building from Elizabethport on the CNJ south to Perth Amboy. Hostilities at the crossing of the Pennsylvania Railroad's Perth Amboy and Woodbridge Railroad in April 1872 led to an injunction against the PRR interfering with the construction. The CNJ bought the PA&E later that year. The full line to Long Branch opened September 7, 1875, and was later extended south, reaching Bay Head in 1881 by acquiring other companies. In 1882 the CNJ and Pennsylvania Railroad agreed to use the line jointly, with trackage rights granted to the PRR over the Perth Amboy and Elizabethport between the Perth Amboy and Woodbridge crossing and its south end at the Raritan River bridge.
    The CNJ leased the Dover and Rockaway Railroad for 990 years from April 26, 1881; the Ogden Mine Railroad for 999 years from January 1, 1882; and the Hibernia Mine Railroad for 20 years from October 1, 1890, renewed at least once for another 20 years.
    Reproduction of a tablet designator for the CNJ Blue Comet
    In late 1917, the following companies were absorbed into the CNJ:
    Buena Vista Railroad
    Carteret and Sewaren Railroad
    Carteret Extension Railroad
    Cumberland and Maurice River Railroad
    Cumberland and Maurice River Extension Railroad
    Elizabeth Extension Railroad
    Freehold and Atlantic Highlands Railroad
    Lafayette Railroad
    Manufacturers' Extension Railroad
    Middle Brook Railroad
    New Jersey Terminal Railroad
    New Jersey Southern Railroad
    Navesink Railroad
    Passaic River Extension Railroad
    Raritan North Shore Railroad
    Sound Shore Railroad
    Toms River Railroad
    Toms River and Barnegat Railroad
    Vineland Railroad
    Vineland Branch Railway
    West Side Connecting Railroad
    West End Railroad
    A CNJ camelback locomotive built by Baldwin in the 1920s
    In 1901 the Reading Railroad gained control of the CNJ, which lasted until the creation of Conrail on April 1, 1976.[2]
    The first commercially successful diesel-electric locomotive, manufactured by Alco in 1924, was built for the Central Railroad of New Jersey.
    In 1929 the CNJ began operating its most famous train, the Blue Comet, from Jersey City to Atlantic City. It ran until 1941.
    The Interstate Commerce Commission (ICC) authorized the CNJ to acquire the Wharton and Northern Railroad and the Mount Hope Mineral Railroad on February 4, 1930.
    The Hibernia Mine Railroad was merged into the CNJ on November 25, 1930.
    Main initial corridors
    CNJ had its northeastern terminus at Elizabethport, New Jersey. In 1864 CNJ extended its railroad across the bay into Bayonne, and north to the Jersey City terminus. It had used a succession of bridges over the years, the last being Newark Bay Bridge, demolished in the 1980s.[3]
    From Elizabethport, trains went to different corridors. One headed towards Elizabeth and Plainfield and points west and southwest. The second went south towards Perth Amboy and today's North Jersey Coast Line and different southern New Jersey destinations. CNJ operated several trains into Pennsylvania and other points west or south, in association with the Reading Railroad. B&O also used CNJ tracks for the final approach to Jersey City.[3][4][5]
    Portions still operated
    Aldene-High Bridge (Main Line): New Jersey Transit (NJT) Raritan Valley Line
    Perth Amboy-Bay Head: NJT North Jersey Coast Line
    Elizabethport-Aldene; Elizabethport-Perth Amboy; Jersey City-Bayonne; Red Bank-Lakehurst: Conrail Shared Assets Operations
    Lakehurst-Woodmansie: Cape May Seashore Lines
    Winslow Junction-Vineland: Southern Railroad of New Jersey
    Dover & Rockaway Branch (Wharton-Rockaway); High Bridge Branch (Kenvil-Flanders): Dover and Rockaway River Railroad
    Please! Click on 'See other Items' on 'Seller Information' to see other Great items for sale.
    Payment should be made within 3 days.
    My goal is to ship within 3 business days from auction end. All items are packed very well & should arrive in good condition unless the shipper is negligent and causes damage. All items are insured but you may be required to take the item to the Shipper for inspection in the event of damage,if requested, before any refund can be processed.
    I combine shipping if requested.
    How to combine shipping on eBay?
    1.
    When you see an item you like, click "Buy It Now" or wait until you win your auction. 2. You will be taken to a webpage that confirms your order with the option to Continue Checkout. Do not checkout to pay for this item (yet). 3. When you are finished shopping for your several items, proceed to your "Purchase History". You will see the option on the right side of your just-ordered items to "Pay Now" or "Request total from seller". Select "Request total from seller" and enter a message to notify the seller that you would like to combine your orders to ship together. 4. Wait for the seller to send you a new invoice.  Pay that invoice.
    If you are looking for the lowest cost shipping press “shipping details” button and it may offer a lower cost service to your location. You are responsible to read the entire description.  Insurance on uninsured mail is included in the Handling price. Please use Contact seller button if you have questions about an item or think something in the listing is erroneous or you want to make an offer.  I have been in business for 8 years.  If you want to see my feedback on Ebay go to my stores at Uniqueantiques1000 or Antiques1000go.
    Please do not contact me with your opinions about an item or its price.  This is a store and the contact seller link is not a forum for collector’s opinions. Thanks.
    Brought to you by Antiques1000.